Pavilosta port promenade
Return Get directions

Pavilosta port promenade

Pavilosta port promenade

The construction of the Pāvilosta port promenade started in 2019 and was completed in May 2020. The promenade is located at the Pavilosta Local History Museum, Dzintaru Street 1. The total length of the promenade is about 200 meters.